Project Description

Hillside Ave Bridge

Do You Have A Construction Project We Can Help With?

Get a free quote

Hillside Ave Bridge

Built in 1936, the existing Hillside Avenue Bridge over the Mamaroneck River project is being demolished and rebuilt. DMB work includes carefully removing the existing stone masonry and anchoring devices and eventually reinstalling them on the new bridge. DMB will be required to catalog and tag each stone and maintain a key drawing indicating the location of each stone. Stones are then stored on pallets and projected until they are to be cut and reused on the new bridge.

Project Gallery

DMB Construction Group - Hillside Ave Bridge 1
Thank you for your message. It has been sent.
There was an error trying to send your message. Please try again later.